Task management

Bachelorizer follows kanban principles for task management, using roadmap (described below) as a form of kanban board.

Kanban is a japanese management method of visually placing signs (kam) on a board (ban), intended to to aid in breaking down a project into smaller tasks to support team-based self-organization [@Anderson2016, pp. xi-1].

Two core principles of kanban is to visually present an overview of tasks as a way of identifying them, and associating tasks with a progress state as a way of managing flow of progress. Commonly a two-dimensional kanban board provides overview, with individual tasks listed vertically and divisions of task states horisontally [@Anderson2016, p. 18]. One of the aims of these principles is to establish a sense of sustainability in the pace of working on the tasks involved in a project [@Anderson2016, pp. 7-8].

With Bachelorizer, the tool roadmap is used for visualizing the tasks. Reason for this choice is an interest in creating an atmosphere supportive of creative thinking and reflective learning rather than efficiency, for which the assembly line metaphor of conventional kanban boards is considered counterproductive.

Roadmap is a command-line tool to generate a somewhat organic looking graph-based tree of tasks from a plaintext source task list. Roadmap takes as argument a filename for a YAML-structured list of tasks, validates that all tasks are related as a directed acyclic graph (DAG) with only a single end node (a tree structure), and renders to stdout an SVG format visual diagram of the tasks. The diagram maps out the tasks and their relationships, with prioritized actionable tasks as green circles, other actionable tasks as white circles, later tasks as red pentagons, blocked tasks as orange rectangles and finished tasks as grey hexagons. Each task is defined with a keyword and a label in the YAML file, optionally adding an explicit state of either finished, ready, next (meaning prioritized) or blocked, and listing directly dependending task. Task state is resolved from dependencies if not stated explicitly; only one task, the final goal, can and must have no dependencies. After each YAML file edit the visual diagram can be (re)generated, which also checks that the edited YAML contents is structurally and semantically valid. [@Wirzenius2025].

For comparison with conventional kanban boards, roadmap visualizes not as a 2-dimensional matrix with progress as rigid lines across the x-axis and sustainability indicated by downwards depth, but instead visualizes as a somewhat organic looking tree structure, with progress as neat (non-warning-colored) branches and sustainability indicated by color saturation.

The requirements for the first portfolio delivery for Bachelorizer are summarized as the following tasks:

  1. Make a Kanban board for this assignment.
  2. Make a class diagram for the Bachelor programme and its components.
  3. Implement classes to represent the Bachelor programme and its components.
  4. Implement a method to check whether a programme is valid.
  5. Specify and run unit tests for the valid method.

These larger tasks have been expanded and reorganized into more smaller and narrower focused ones, visualized in in the roadmap at @fig-kanban as well as the early snapshot of the roadmap in @sec-kanban-early.

Current roadmap for Bachelorizer{#fig-kanban}

Diagram

TODO: Short introduction to the diagram.

UML Class Diagram for Bachelorizer

Validity of bachelor programmes

The isValid() function in the Programme class currently works by checking which type an activity has based on the result of activity.toString(). It simply runs through every activity and adds 1 to a counter for each category. It calculates ECTS based on getEcts() for each activity, originally supplied by a long list of object declarations in the Main class. This could very well be integrated with the database to get more and accurate information about each activity, but time pressure has prevented us from this implementation, even though the project structure easily allows it. The expected values for count and total ECTS for validation supplied by the assignment description is then validated in a simple return statement.

The unit tests simply create example programmes similar to what is done in main and then calls the isValid() function to compare to expected values. Other unit tests could explore edge cases. For example, the current structure of the classes does not truly differentiate between the subject modules that activities are part of, so it has no way of enforcing that subject module activities are part of exactly 2 subject modules. Another implementation that could pass such a unit test would need each activity to have an attribute describing which subject module it is part of.